Belleville Fire Hall
General Contractor – Mirtren Contractors Ltd.
New Belleville Fire Hall, this is a 22,500sq' State of the art facility replacing 2 existing local fire Halls.
General Contractor – Mirtren Contractors Ltd.
New Belleville Fire Hall, this is a 22,500sq' State of the art facility replacing 2 existing local fire Halls.
General Contractor – Quinan Construction
Hasting Price Edward County Health Unit - 32,528sq' state of the art Medical facility with a full penthouse mechanical room.
General Contractor – Nautical Lands Group
Located in Beautiful Prince Edward County Ontario, Wellings of Picton is an award winning 4 story 137 Bed community living center catering to ages 55+.
General Contractor – Quality Mechanical
Quality Mechanical has been assisting the College with many renovations and upgrades throughout the facility, allowing the school to operate in a more cost effective manner.
General Contractor – Ledcor Construction
Completed in 2004, Hastings Manor is 253 bed, 185,000 square foot long-term facility. This state of the art facility consists of a full Penthouse Mechanical Room.
General Contractor – PCL
A six story 171,146 square foot LEED Silver Certified building. This building has a mechanical penthouse level, with eleven courtrooms, for both municipal and provincial services, along with above and underground parking. This project is set to be completed in 2013.
General Contractor – Gillin Engineering
Overlooking Kingston, Ontario’s beautiful harbour front, the Marriott is 10 stories fully equipped with its own restaurant and fitness facility. The building is equipped with a full mechanical and plumbing system, and a penthouse Mechanical Room. This project was completed in July 2010.
General Contractor – Bird Construction Company LTD.
A state of the art 188,000 square foot Electrical and Mechanical Engineering and transportation garage, completed in 2012. This allowed the Military Operational effectiveness to increase substantially by taking what was operating in 5 buildings into one large facility.
General Contractor – Graham Construction
The 125,000 square foot, two hanger bay facility will include office space and shop support areas as well as, this hanger will hold two CC-130J aircrafts. This project is set to be completed April 2013.
Steelcore Construction has used Quality Mechanical on several projects over the past few years. The majority of these projects have been elementary schools with very tight schedules. Quality Mechanical has been very accommodating with understanding the critical nature of key dates and meeting them. - Steelcore Construction
Quality has been very fair with their pricing, and any extra job costs. The staff (both onsite and office staff) are friendly and informative, addressing inquiries in a timely fashion. They are readily available on an on-call basis and are prompt with scheduled services. - Hastings and Prince Edward District School Board
...Despite the aggressive, fast-track schedule and complexity of design, we sensed a depth in your organization and a commitment on your part to make this project successful. Quality Mechanical provided Ameresco and the HPEDSB with a first-class problem-free installation. The Quality team was impressive with significant strengths in site supervising and project documentation. We never felt there was a situation you couldn't handle. And we never fell out of the loop or lost in the shuffle. They always gave us their full attention, made us feel like our job was important. - Ameresco